W = S/(1 − ρ) is the single most useful rearrangement on this path. Divided through by S it says the response time is the reciprocal of the headroom: two service times at 50%, ten at 90%, a hundred at 99%. It is a hyperbola, its asymptote is at ρ = 1, and nothing a designer can buy moves it.

W = S/(1 − ρ) M/M/1's W, written in service times W/S = 1/(1 − ρ) a hyperbola; the asymptote sits at ρ = 1 ρ = 1/2 → 2 ρ = 9/10 → 10 ρ = 99/100 → 100 50% to 90% ×5 90% to 99% ×10 more W = kS at ρ = (k − 1)/k leaving exactly 1/k of headroom
One curve, read forwards and backwards

Core ideas

What this lesson establishes

There is one function here and two ways of asking questions of it. The second way is the one capacity planning needs.

1

Response time tracks the headroom, not the load

W/S = 1/(1 − ρ) has 1 − ρ in the denominator, so what determines the wait is how much of the server is spare. Halving the spare capacity doubles the response time regardless of where you started, which is why the same ten percentage points of load cost five times as much at the top of the range as at the bottom.

2

The asymptote is the whole content

As ρ approaches one the curve rises without bound. No faster disk, no better garbage collector and no amount of tuning moves a vertical asymptote: those things change S, which scales the curve, while the blow-up stays exactly where it was. Algebra's graphs-and-asymptotes is the shape.

3

Planning reads the curve backwards

Nobody picks a utilisation and accepts the response time that falls out. The useful direction is to name what you will tolerate — W = kS — and solve for ρ = (k − 1)/k. Tolerate four service times and you may run at three quarters; tolerate ten and you may run at nine tenths.

The material

The hyperbola, and the target utilisation it implies

The curve, three points on it, the inverse question, and what the last tenth of a machine actually costs.

From the previous lesson, W = L/λ with L = ρ/(1 − ρ) gives W = 1/(μ − λ), and dividing numerator and denominator by μ turns that into W = S/(1 − ρ) with S = 1/μ. It is the same quantity in the units a designer thinks in: multiples of how long the work itself takes.

Definition · The response-time factor

W/S = 1/(1 − ρ) is how many service times a request spends in the system. It is 1 at ρ = 0 — the work and nothing else — and it is unbounded as ρ approaches 1. The knee is not a particular point on this curve; it is the fact that the curve has no particular point, and that the interesting region is always the last few percent.

S = 10 ms ρ = 1/2 W/S = 2 W = 20 ms ρ = 9/10 W/S = 10 W = 100 ms ρ = 99/100 W/S = 100 W = 1000 ms 50% → 90% 10 ÷ 2 = 5 five times the wait 90% → 99% 100 ÷ 10 = 10 ten times again

Notice what those two multipliers have in common: the first covers forty points of utilisation and the second covers nine, and the second is the more expensive. The utilisation axis is the wrong axis to reason on. The headroom axis — 1 − ρ, going 1/2, 1/10, 1/100 — is the one the response time is actually a function of.

Reading it backwards: the target utilisation

Set W = kS and solve. 1/(1 − ρ) = k gives ρ = (k − 1)/k, so the headroom you must keep is exactly 1/k. Tolerating twice the service time means running at 1/2; four times means 3/4; ten times means 9/10; a hundred times means 99/100, which is the point at which a single machine failure in a pool is an outage rather than an event.

Example · Where a capacity plan's target comes from

Capacity Estimation divided an offered rate by a target utilisation rather than by μ, and took the target on trust. This is where it is earned: the target is (k − 1)/k for whatever k multiple of the service time the design is willing to pay. A plan that names 80% has chosen k = 5, whether or not anybody said so.

The curve also explains a familiar and confusing incident shape. A service at ρ = 1/2 absorbs a doubling of traffic and moves from 2S to 4S, which nobody notices. The same doubling at ρ = 9/10 is not survivable at all: ρ would be 9/5, above one, and there is no response time to quote — only the growth rate of “λ, μ and ρ”. Two systems, the same relative traffic change, and entirely different outcomes.

Two honest caveats. The constant in W = S/(1 − ρ) is M/M/1's: the 1/(1 − ρ) shape is general and the multiplier in front of it depends on how variable the arrivals and the service times are, which the next lesson prices. And W is a mean; the percentiles that Latency and the Tail measured sit further out still, because the number in the system is geometrically distributed rather than concentrated around its average.

Interactive

The knee

Response time against utilisation, and the asymptote you cannot tune away

The kneeW/S = 1/(1 − ρ): a hyperbola, and the asymptote is the whole content
W/Sthe asymptote at ρ = 1where you are

Method

Using the curve in a capacity decision

Start from what you will tolerate, not from what the machine can take.

1

Measure S, not the response time

S is the service time with no queueing in it — the work itself. A measurement taken under load already contains the waiting this curve is about, and using it makes the arithmetic circular.

2

Name the multiple you will tolerate

k in W = kS. This is a product decision expressed as arithmetic: two service times, four, ten. It is the only free parameter on the page.

3

Convert it to a target utilisation

ρ = (k − 1)/k, leaving 1/k of headroom. Quote the headroom alongside the utilisation, because the headroom is the quantity the response time depends on.

4

Check what a plausible surge does to that point

Multiply the offered load by whatever surge the system has to survive and recompute ρ. If it crosses one, the plan does not have a response time, it has a growth rate.

Along the hyperbola

Score 0 / 0

A 10 ms service, at three utilisations and then backwards

The same service, the same work, three loads — and then the question capacity planning actually asks.

S = 10 ms W = S/(1 − ρ) ρ = 1/2 W/S = 1/(1/2) = 2 W = 20 ms ρ = 9/10 W/S = 1/(1/10) = 10 W = 100 ms ρ = 99/100 W/S = 1/(1/100) = 100 W = 1000 ms from 50% to 90% ×5 from 90% to 99% ×10 nine points of load, ten times the wait backwards: tolerate W = 10S 1/(1 − ρ) = 10 → ρ = 9/10, headroom 1/10 tolerate W = 4S → ρ = 3/4, headroom 1/4 tolerate W = 2S → ρ = 1/2, headroom 1/2

The three headroom figures are the whole table restated: 1/k of a machine kept idle buys a response time of k service times. Nothing else on this page is doing any work.

It also shows why “we have 10% headroom” and “we have 1% headroom” are not neighbouring states. They differ by a factor of ten in response time, and the second one has no room for the variability of “Why Queues Form at ρ < 1” at all.

For a faded rehearsal, take S = 4 ms and a tolerance of W = 5S. The supplied first move is that k = 5 gives ρ = 4/5. Compute W at that target, then compute what W becomes if the service time degrades to 5 ms with the load unchanged.

Common mistakes

1
Expecting response time to grow with loadIt grows with the reciprocal of the headroom, which is a different function entirely. A graph of W against ρ looks almost flat across most of its range and then leaves the page, and a team extrapolating linearly from two comfortable measurements will underestimate the third by an order of magnitude.
2
Planning to a maximum utilisation rather than a target“The box can do 10 000 a second” is a statement about ρ = 1, which is the one utilisation at which the system has no response time. The number a plan needs is (k − 1)/k for a stated k, and the difference between the two is the entire safety margin.
3
Quoting W = S/(1 − ρ) as universalThe 1/(1 − ρ) shape is general; the constant is M/M/1's. A service with very regular arrivals and durations waits less than this curve says, and one with bursty arrivals waits more. Carry the shape everywhere and carry the constant only where the assumptions hold.

Check your understanding

✓
Finish when a target utilisation reads as a choice of k in W = kS.

You should be able to compute W/S at any rational ρ, invert it to a target utilisation and a headroom, explain why nine points of load cost more than forty, and say what a plausible surge does to the point you have chosen.

Note: The constant in front of the hyperbola is the next question. “Variability: the Kingman Approximation” splits the wait into three factors — utilisation, variability and service time — and the middle one is the only one on this course that can be halved without buying anything.

Kept in this browser only, for you. Nothing is sent anywhere and nothing checks it. Carry it to another device.

Feedback and recommendations

Something to change about this lesson? Write it down, tick it off when it is handled, and export the list when you want to act on it. Kept in this browser only: nothing is sent anywhere, and nobody is notified.

No recommendations yet for this lesson.